|
The tenderer shall accept the terms and conditions in the enclosed Framework Agreement (see Appendix 1). The tender may not contain information contravening the commercial conditions. Has this requirment been fullfilled?
|
| 2 |
Shall criterion regarding the Specification |
Response required |
|
The tenderer shall provide one (1) or two (2) named consultant who will be responsible for the assignment. The consultant’s education and experience shall be documented in an accompanying Curriculum Vitae.
If the tenderer submits more than two names of consultants to be in charge of the assignment for this review topic, SSM will select and evaluate only two of them.
|
| 3 |
Shall criterion regarding the Specification |
Response required |
|
The named consultant shall have knowledge and experience of:
Previous assignment connected to natural or induced seismic events
The consultant(s) shall have completed at least three (3) assignments over the past 5 years connected to natural earthquakes or induced seismic events.
Has this requirement been met?
Submit a brief description of completed assignments:
|
| 4 |
Shall criterion regarding the Specification |
Response required |
|
Impartiality requirement
The consultant shall not have been involved directly, or indirectly through subcontracting, in work for the Swedish Nuclear Fuel and Waste Management Co. (SKB), any of its subsidiaries or its Finnish counterpart, POSIVA[1], in the past two years. The tender must include a declaration that individuals intended for review or modelling tasks have not been involved in work commissioned by these companies after 01/01/2010. Furthermore, all work conducted by the consultant for SKB or any of its subsidiaries, directly or indirectly through subcontracting during the past four years must be stated in the application. SSM reserves the right to disqualify a consultant who has made essential contributions to the license application through assignments for SKB or any of its subsidiaries, directly or indirectly through subcontracting during the past four years. Moreover, SSM will evaluate the significance of other engagements and financial ties according to the appended SSM policy document dealing with disqualification and conflicts of interest.
Have these requirements been met?
Submit the declaration and, if applicable, a summary of the consultant’s work for SKB or any of its subsidiaries, directly or indirectly through
subcontracting during the past four years. In addition, fill in and submit the appended SSM form dealing with disqualification and conflicts of interest, enclosure 5.
|
| 5 |
Shall criterion regarding the Specification |
Response required |
|
Fluency in the English language in speech and writing
The consultant shall have fluency in English in speech and writing.
Has this requirement been met?
|
| 6 |
Shall criterion regarding the Specification |
Response required |
|
Other consultant(s) within the area of seismology for technical assistance
The tenderer may propose one (1) or two (2) consultant(s) for technical assistance for the assignments requested. All the proposed additional consultant(s) shall have at least two (2) years knowledge and experience from seismology projects and fluency in the English language in speech and writing.
Have both these requirements been met?
State the name(s) of the proposed consultant(s) and submit a brief description of their expert knowledge and experience.
|